The project includes the excavation-support works and inner lining of the two tubes highway tunnel with the length of 3,860 m on the Blacksea seaside road, between Perşembe-Boloman.
| Location | TÜRKİYE |
| Client | Republic of Turkey General Directorate of Highways |
| Project Scope |
|