
The project includes a 2,869 m double-track single-tube tunnel, 7,337 m + 7,346 m one-way double-tube tunnel, 1,380 m emergency tunnel, 4 viaducts, and 5 railway stations, and the total length of the line is 55 km. The project also includes the construction of 9 overpasses and 24 underpasses.