İzmir Light Rail System 4th Stage Fahrettin Altay-Narlıdere District Governorate Construction Work

İzmir Light Rail System Phase 4 Fahrettin Altay-Narlıdere District Governorship Construction Work within the scope of "Excavation and Support for Tunnel (NATM) and Shaft Structures, Interior Coating Concrete, Injection Works" has been completed.

Among the stations involved in the extension of the existing metro line of İzmir, the Fahrettin Altay - Bornova line, to Narlıdere; tunnels belonging to Balçova, Çağdaş, Dokuz Eylül University and Faculty of Fine Arts were manufactured by our company. In addition, the M1 switch tunnels planned to be built in Narlıdere, the project emergency exit shafts and their cross passage tunnels have also been completed by Soner Temel Mühendislik.

Location TÜRKİYE
Client Metropolitan Municipality of Izmir
Project Scope
  • Punch production (Umbrella Arch, Soil Nail, Rock bolt, Ibo Blon etc.)
  • Excavation production (Shaft,Tunnel etc.) 
  • Permanent coating concrete production 
  • Wire mesh steel work
  • Iron reinforcement work

Biz ve ortaklarımızın, sizi hatırlayabilmesi ve siz ve diğer ziyaretçilerimizin sitemizi nasıl kullandığınızı anlayabilmesi için, sitemiz çerezleri ve diğer teknolojileri kullanır. Bu teknolojilerin tam listesini görmek ve bize bunların cihazınızda kullanılıp kullanılamayacağını bildirmek için burayı okuyabilirsiniz. Sitemizi daha iyi bir şekilde kullanmanız için çerez politikamızı kabul ediyor musunuz?

Accept