M7 Mecidiyekoy – Mahmutbey Metro Construction

As part of the 18 km long M7 Mecidiyeköy - Mahmutbey Metro Line project with 15 stations, planned between Kabataş and Esenyurt and being the first stage of the first driverless metro line on the European side; two shafts with a diameter of 14.05 m and a length of 32 m and 42 m at the tunnels of the Karadeniz Mahallesi station, a tunnel excavation of about 800 m and shafts between km 19+762-KM 20+162 of Yüzyıl Station and NATM tunnels were constructed.

Besides; within the scope of Kazım Karabekir Station, the construction of 100 cm diameter and 10.000 m bored piles with a permanent column, the manufacture of 120 cm diameter and 12.000 m bored pile retaining system for construction with Top-Down method and conventional excavation method at Göztepe Station, 2 Platform tunnel excavations Line 1 (168 m.) and Line 2 (187 m.) and also excavation and support works of 4 connection tunnels and 2 pedestrian stair tunnels were carried out.

Location TÜRKİYE
Client Istanbul Metropolitan Municipality
Project Scope Tunnel Excavation Works