M7 Mecidiyekoy – Mahmutbey Metro Construction

As part of the 18 km long M7 Mecidiyeköy - Mahmutbey Metro Line project with 15 stations, planned between Kabataş and Esenyurt and being the first stage of the first driverless metro line on the European side; two shafts with a diameter of 14.05 m and a length of 32 m and 42 m at the tunnels of the Karadeniz Mahallesi station, a tunnel excavation of about 800 m and shafts between km 19+762-KM 20+162 of Yüzyıl Station and NATM tunnels were constructed.

Besides; within the scope of Kazım Karabekir Station, the construction of 100 cm diameter and 10.000 m bored piles with a permanent column, the manufacture of 120 cm diameter and 12.000 m bored pile retaining system for construction with Top-Down method and conventional excavation method at Göztepe Station, 2 Platform tunnel excavations Line 1 (168 m.) and Line 2 (187 m.) and also excavation and support works of 4 connection tunnels and 2 pedestrian stair tunnels were carried out.

Location TÜRKİYE
Client Istanbul Metropolitan Municipality
Project Scope Tunnel Excavation Works

Biz ve ortaklarımızın, sizi hatırlayabilmesi ve siz ve diğer ziyaretçilerimizin sitemizi nasıl kullandığınızı anlayabilmesi için, sitemiz çerezleri ve diğer teknolojileri kullanır. Bu teknolojilerin tam listesini görmek ve bize bunların cihazınızda kullanılıp kullanılamayacağını bildirmek için burayı okuyabilirsiniz. Sitemizi daha iyi bir şekilde kullanmanız için çerez politikamızı kabul ediyor musunuz?

Accept