Mahmutbey - Bahcesehir - Esenyurt Metro Line Construction and Electromechanical Systems Procurement, Installation, and Commissioning Works

These projects were completed in accordance with the conditions of our Sub-Agreement "NATM Works for the Main Line and Overnight Line between S2-Temapark Station (Line 1 KM: 5+967,48 - 6+545,09 - Line 2 KM: 5+972,25 - 6+556,62) and Atatürk Station Platform Tunnels (Line 1 KM: 3+181,00 - 3+411,00 - Line 2 KM: 3+166,87 - 3+396,87) signed on July 14, .2022. The NATM shaft opened at the S2 construction site is one of the deepest NATM shafts ever opened in Istanbul.

Location TÜRKİYE
Client Metropolitan Municipality of Istanbul
Project Scope With our subcontractor contract dated 14.07.2022, the works carried out in the 'main line and overnight line tunnels between S2 Shaft - Temapark Station' and 'Atatürk Mahallesi station tunnels' on the line containing "Atatürk Mahallesi, Toplu Konutlar, Tema Park, Hastane" stations, which is the first part of the extension of the M7 Mecidiyeköy-Mahmutbey line, which is currently in service on the European side of Istanbul, from Mahmutbey station to Esenyurt:

  • Punch production (Umbrella Arch, Soil Nail, Rock bolt, Ibo Blon etc.)
  • Excavation production (Shaft,Tunnel etc.) 
  • Permanent coating concrete production 
  • Wire mesh steel work
  • Iron reinforcement work

Biz ve ortaklarımızın, sizi hatırlayabilmesi ve siz ve diğer ziyaretçilerimizin sitemizi nasıl kullandığınızı anlayabilmesi için, sitemiz çerezleri ve diğer teknolojileri kullanır. Bu teknolojilerin tam listesini görmek ve bize bunların cihazınızda kullanılıp kullanılamayacağını bildirmek için burayı okuyabilirsiniz. Sitemizi daha iyi bir şekilde kullanmanız için çerez politikamızı kabul ediyor musunuz?