Thenia - Tizi Ouzou Double Track Railway Construction and Electrification Project

This project contains 50 km railway construction, 50+14 km electrification, earthmoving and drainage works, construction of bridges, viaducts, tunnels, stations, electrical works, signalization and telecommunication, renovation of the existing line and railway stations. Total length of the 9 viaducts is 2,955 m, total length of 4 tunnels is 2,947 m

Location ALGERIA
Contractor TEIXEIRA DUARTE, ETRHB,OZGUN INSAAT, ENYSE Partnership
Client ANESRIF
Project Scope 50 km double track railway 50+14 km electrification 4 tunnels 2,947 m 9 viaducts 2,955 m