Yenikapı Wastewater Tunnel Construction

Yenikapı Wastewater Tunnel Project, which transports the wastewater of Gaziosmanpaşa, Eyüp and Fatih Districts, located in the Southern Golden Horn basin, to the Yenikapı Wastewater Treatment Plant (European Side 2nd Part Wastewater Tunnel Construction) includes the construction of a tunnel with EPB-TBM with an inner diameter of 3600 mm, an excavation diameter of 4600 mm and a length of 8500 m. There are also two shafts with an inner diameter of 9 m, five shafts with an inner diameter of 7 m and two shafts with an inner diameter of 5 m, and a connection tunnel with an inner diameter of 2.20 m and a length of 934 m.

Location TÜRKİYE
Contractor Ilci Insaat – Ozgun Insaat Joint Venture
Client Metropolitan Municipality of Istanbul Istanbul Water and Sewerage Administration (İSKİ) Sewerage Section Directory
Project Scope 8.500 m tunnel

To enable us and our partners to remember you and understand how you and other visitors use our website, we use cookies and other technologies. You can view the full list of these technologies and learn more about how we use cookies by visiting our Cookie Policy. Do you accept our cookie policy to enhance your experience on our site?

Accept