Istanbul Metro Taksim-Unkapanı, Unkapanı - Yenikapı Metro Construction

The 5.2 km Taksim-Unkapanı, Unkapanı-Yenikapı metro line construction work of the Istanbul Metro Project, which was carried out to provide a solution to the increasing traffic problem of Istanbul, consists of approximately 2,600 m main line and 5 stations (Şişhane, Unkapanı, Haliç, Vezneciler, Yenikapı). Haliç Station is located on the Golden Horn Metro Bridge. All other stations are built as tunnel/underground stations.

Within the scope of the project, Şişhane approach tunnel is approximately 1,250 m. Excavation-supporting and concrete lining works of the line tunnels, P-type ventilation tunnel, excavation-supporting and concrete pavement works of the İstiklal Street pedestrian connection tunnels were carried out. At the Vezneciler and Yenikapı stations of the Unkapanı-Yenikapı line, which is the second phase of the project, approximately 500 m of main line tunnel (42 m² section) and 3 switch tunnels (102 m² section) were opened in weak ground environment and the inner lining concrete works were completed.

In the tunnels, NATM 
(New Austrian Tunneling Method), pre-supporting with Umbrella Arch Method in weathered greywacke soil, PVC waterproofing membrane, reinforced concrete inner lining methods were executed.



Location TÜRKİYE
Client İstanbul Metropolitan Municipality
Project Scope
  • 1,250 m metro 
  • 500 m single line tunnel (42 m² section)
  • 3 switch tunnels  with a total length of 180 m (102 m² section)

Biz ve ortaklarımızın, sizi hatırlayabilmesi ve siz ve diğer ziyaretçilerimizin sitemizi nasıl kullandığınızı anlayabilmesi için, sitemiz çerezleri ve diğer teknolojileri kullanır. Bu teknolojilerin tam listesini görmek ve bize bunların cihazınızda kullanılıp kullanılamayacağını bildirmek için burayı okuyabilirsiniz. Sitemizi daha iyi bir şekilde kullanmanız için çerez politikamızı kabul ediyor musunuz?